Methodology

Maintainer, sources, classification of entries, and corrections.

Maintainer

The tracker is maintained by zkSecurity. zkSecurity is a cryptography security firm providing audits, development and research in zero-knowledge proofs, MPC, FHE, TEEs and post-quantum cryptography.

zkSecurity sells audits and is listed in the directory of audit firms. That directory is grouped by specialty and is not a ranking.

Sources and dates

Inclusion of algorithms

An algorithm is listed if a standards body or national agency has standardized it, selected it for standardization, or recommended it. Schemes still under evaluation are listed as candidates. Mechanisms that combine listed algorithms, such as hybrid key exchange, are listed as protocol integrations.

Inclusion of deployments

A deployment is listed if the post-quantum mechanism is in a released version or in production and a primary source says so: release notes, vendor documentation, an engineering post or a certificate record. Announcements, roadmaps, pilots and research prototypes are not listed. Each row states whether the mechanism is on by default, opt-in, or only available to builders.

Classification of feed entries

Each entry carries one classification by type and, where applicable, the action required of a deployer.

Theoretical result

Cryptanalysis that leaves every proposed parameter set at or above its claimed security level, or whose concrete effect is disputed.

Reduced security margin

An attack that places real parameter sets below their claimed security level but cannot be executed. The usual consequence is a parameter change.

Practical attack

Cryptanalysis demonstrated end to end at real parameter sizes.

Scheme broken

Key recovery or forgery at the scheme's claimed parameters.

Implementation vulnerability

A flaw in code or hardware, not in the scheme: timing leakage, fault injection, missing validation, memory safety. Marked Demonstrated where key recovery or forgery was shown.

Claim refuted

A published claim that was withdrawn or rebutted. Recorded so that it can be recognized when it recirculates.

Scheme dropped

Withdrawn by its authors, eliminated from a standardization process, or not selected.

Standards action

A standard, draft, RFC or erratum was published or revised. Specification revised denotes the same for schemes that are not yet standards.

Policy

A government or industry body set or changed a requirement or deadline.

Quantum computing

A resource estimate or hardware result bearing on the date by which migration must be complete.

Action: patch

Required of a deployer of the affected scheme: none, monitor, patch an implementation, or migrate.

An attack on a scheme and an attack on an implementation are recorded separately. The remedies differ: the first requires a change of parameters or of algorithm, the second a patch.

Meaning of "rests on"

For each scheme the tracker lists the hardness assumptions to which its security proof reduces, and the model in which the proof is carried out. This describes the published security argument. It does not assert that the reduction is tight or that it implies the concrete parameters; parameters are set by analysis of known attacks. See assumptions.

Directory inclusion criteria

Data

The site is generated from structured data, published at /api/index.json under CC BY 4.0. The feed is also available as Atom.

Every page has a Markdown version at its address followed by index.md. The newest feed entries are at /api/latest.json, and llms.txt indexes the site for language models.

Corrections

Send the page address and a primary source to pq-tracker@zksecurity.xyz. Corrections are applied with a new review date.